CORBA Mountain Biking Photos. Click on an image to see it full size.
|
Crew 1 work area
|
|
|
Crew 2 work area, to build a new trail segment that bypasses the mud pit.
|
|
|
Crew 3 work area, to widen the trail by digging out the 'slough' that's fallen onto the inside edge of the trail.
|
|
|
Crew 4 work area, to fill the large rut with gravel from the stream.
|
|
|
Crew 4 work area, to fill the huge rut with gravel from the stream. Unfortunately we didn't have enough people to form a Crew 4, so these huge ruts are still there.
|
|
|
The rest of the photos are of Crew 5 at work. Here they're widening the trail.
|
|
|
|
This rut need to be filled and a drain built to keep the water from flowing down the trail and regenerating the rut.
|
|
|
Filling in a rut and leveling the trail We did a lot of this!
|
|
|
|
Building a new drain to divert water off the trail. We did a lot of this, too.
|
|
|
|
|
|
The trail widening is coming along very well!
|
|
|
|
|
|
|
|
|
The trail looks almost new after filling the center rut and levelling it out!
|
|
|
We had a big rut to fill, so we took gravel from the streambed and dumped it in the rut.
|
|
|
Chopping out a yucca plant that's in the way of a new drain.
|
|
|
|
This new drain is almost finished. The final step(s) is to pack it down by stamping it with your feet.
|
|
|
|
This trail 'cut' (shortcut) is being covered with rocks to disuade people from using it.
|
|
|
Filling in the rut with gravel taken from the steambed.
|
|
|